Normally it's just a few days of heavy lifting and unscrewing flats from their supports. Sometimes we have to lower pieces down from the ceiling and then cut them up with the saw so that they fit in the trash can, but normally it's not very taxing work.
Not this time, however! This time they had put down an entire floor for the set, so our first day was spent prying up about a hundred pieces of fake hardwood flooring. Once that was finished, we had to pull up thousands and thousands of staples that had been holding that flooring down. And if that sounds terrible and difficult, it's mostly because it is. We worked for hours, only to find more staples that we'd missed. And when we pulled down more pieces of the set, we found staples in them as well. It felt like the entire theatre was put together from staples alone. Well, staples and wood glue.
I got four days of work out of this strike, which equals a nice little chunk of cash. I have a gig tomorrow morning as a model for historical costumes, which I'm really looking forward to. I'll try to snag some photos of my own to post and share, but I'll be sure to link to the official ones when they get posted. It's going to be a fun time!
3 comments:
Impressive - going from laborious deconstruction to costume modeling.
Just doing what I need to do to make ends meet. Using my muscles, then using my face.
Although your face doesn't usually hurt afterwards. Ha!
Post a Comment